- UPS Installation Nov 12-14 done by Oxford engineer
- Second AC 370 installation ( Alexey, Ke , open schedule)
- More cables from top of fridge to M/C plate (Raul; Nov 8-14)
- Cuoricino Electronics (Tommy, Jon, Melanie time permitting , ???)
- Thermalization plate for flex PCB (Jon, Nov 5 + lead time for SM Mirco-D)
- Alpha source (Raul, Tommy)
- Move Cuoricino electronics to Faraday Box on top of the fridge, maybe Fremont Precision Metals
|
|